← All projects Education | Commercial

Catalyst Building, Spokane

Integrated wireless, AV and low-voltage systems for a mass-timber building targeting zero carbon and zero energy.

The project

Catalyst is a cross-laminated timber building in the Spokane EcoDistrict, designed to prove that zero-carbon and zero-energy performance can be achieved without a cost premium. A 213 kW rooftop solar array, an exceptionally tight building envelope and a shared all-electric district heating and cooling plant all contribute to the result.

Connectivity as part of the core design

One of the project's three waste-reduction principles was to assemble and align mechanical, electrical, fire, low-voltage and IT systems together rather than as separate packages. Building wireless, audio visual and technology systems into that integrated approach meant fewer clashes, less rework and a cleaner fit-out.

  • Wireless coverage designed alongside the timber structure and daylighting strategy
  • Audio visual and technology contracting delivered within the same coordinated program
  • Low-voltage and IT systems aligned with building controls for an efficient, data-rich building

The outcome

A building that performs as a showcase for low-carbon construction, with the connectivity tenants expect and the infrastructure to monitor and manage energy use over its life.

Gallery

Wireless, AV and technology scope delivered by RFI Connected™.

More projects

Multi-Family

McKenzie Apartments, Seattle

A 450-unit downtown residential tower where the team delivered public safety DAS, cellular DAS validation and the full low-voltage backbone.

Commercial

Alaska Airlines Global Training Center

Low-voltage upgrades and integration across a 660,000 sq ft aviation training and operations hub in Renton, Washington.

Public Sector

Denver Leading the Way on Energize Denver Compliance

Energy audits across 70 municipal facilities, turned into more than $5 million in targeted building upgrades.

Talk to our team about your next building.